Temporary power.
Built around
your site.

Solar and battery power for pop-ups, activations, markets and outdoor kiosks across the UAE. Share your requirements so we can assess a suitable rental setup.

Enquiries open · availability and specifications confirmed after assessment.

Concept illustration of a portable solar array connected to a separate battery cabinet, without a vending machine
Concept illustration · not confirmed rental inventory
Solar + battery power
Matched to your requirements
Temporary UAE sites

Power for what
comes next.

Different projects ask different things of a power system. Start with the application, then look at the equipment and the site.

Concept illustration of solar and battery equipment beside pop-up shops
Concept illustration · equipment and arrangement subject to assessment

A temporary shop. A considered power plan.

Tell us about your lighting, payment terminals, displays and other equipment. We will review the connected load and operating schedule together.

  • Equipment and starting demand
  • Trading hours and overnight needs
  • Space for solar and storage

A different way
to plan temporary power.

Assess solar generation and battery storage around the load, the operating day and the place.

01

Consider the surroundings.

Battery-only operation avoids a continuously running combustion engine beside visitors and staff. Cooling fans and other equipment can still make sound.

02

Keep the site in the picture.

Review placement, solar access, weather protection and service routes. A suitable temporary arrangement may avoid permanent trenching, subject to the site and its permissions.

03

Match energy to the job.

Starting demand, daily use and overnight needs inform the assessment. A list of appliances is a better starting point than an assumed package size.

No on-site combustion exhaust during battery-only operation. This does not establish a whole-lifecycle emissions claim.

From the first brief
to an agreed plan.

Each project starts with a review. Equipment availability and deployment arrangements are confirmed individually.

01

Start with what needs power.

Share your location, dates, equipment and operating hours. Unknown details can be flagged for review.

Build your rental brief
  • Location and venue
  • Rental period
  • Equipment and schedule

Experience, in context.

DinoTech has operated and monitored off-grid solar-powered vending infrastructure in Dubai. Standalone power rentals are a separate offering and require their own technical and commercial assessment.

Explore the Dubai pilot

Tell us what
needs power.

Build a brief in three steps. We will review your requirements, site and rental period before confirming any proposal.

  • Unknown details are welcome.
  • No payment or booking commitment.
  • Availability confirmed after review.
  1. 01Site and schedule
  2. 02Equipment and operation
  3. 03Review and send

Step 1 of 3

Site and schedule

Capacity, availability and rental terms are confirmed after review.

Enable JavaScript to prepare and send a rental enquiry. Your details will not be submitted without it.

Start with the place and the timing. “Not sure yet” is a useful answer.

Site and schedule

351 / 4,000 characters including the rental brief and notes

Good questions.
Clear starting points.

What to know before sending a temporary power rental enquiry.

Can this replace a generator?

Solar and battery power may be suitable for an appropriately sized load and operating schedule. High starting demand, continuous operation and overnight requirements need individual assessment. No generator replacement or runtime is guaranteed from this page.

Can batteries supply power after sunset?

Batteries can supply stored energy after sunset. Available runtime depends on the selected equipment, state of charge, connected load and operating conditions. Include overnight requirements in your brief.

What rental periods can I enquire about?

You can enquire about short events, weekly use and longer projects. Equipment availability, the rental period and commercial terms are confirmed after review.

What does quieter operation mean?

Battery-only operation does not require a continuously running combustion engine beside the load. Cooling fans and other equipment may still make sound. No measured noise level is claimed here.

Will my venue need approvals?

Requirements depend on the venue, electrical arrangement, structures and public access. Site rules and relevant permissions are reviewed before a deployment is confirmed.

Are prices and capacities listed?

No fixed package, price or capacity is offered on this page. The connected equipment, schedule, transport, setup, support and site constraints inform an individual assessment and proposal. Sending a brief is not a booking or payment commitment.